Re-design & SEO project started on the 21st of November 2015 which at mid-Jan 2016 was ranking for 1500 keywords (according to ahrefs.com). The website was on-page optimized and there were targeted 5 main keywords. Result : 1.4 k visitors per month
Extra 1 month SEO campaign for another 5 keywords. Middle of February 2016 : 2.4K ranking keywords and campaign is half way through.
10
keywords targeted
2400
ranking keywords as a result of the SEO campaign
1400
visitors/month
6